Multifamily

    The Quincy

    8th Floor Downtown Denver Multifamily Pool with a Viewing Window

    Location

    Denver, CO

    Completed

    December 2017

    Duration

    15 months

    Client

    GE Johnson / Shea Homes

    Project Overview

    An 8th-floor elevated pool featuring a generous tanning ledge for relaxed lounging, transitioning to a dramatic depth of nearly 10 feet. A full-width acrylic viewing window spans the pool, creating a striking visual connection—offering swimmers panoramic views of the city below while transforming the pool into a bold architectural spectacle visible from the streets beneath.

    Client Vision

    To be one of the first podium pools in the Metro area, featuring a unique viewing window from below.

    Challenges & Solutions

    The Challenge

    Logistical challenges are typical for these projects, and the addition of a view window, which was a new element for us, presented further complexities. Fall protection was also a key concern due to the pool's edge-of-building construction.

    Our Solution

    Daily coordination of deliveries and the crane schedule was key to staying on schedule. Patience was also essential, as our schedule wasn't everyone else's. Constant communication and safety inspector visits ensured we remained safe and met all safety requirements.

    Results

    Successfully delivered one of the first podium pools in the Denver Metro area, featuring a stunning acrylic viewing window that has become a signature architectural element of the building.

    Our Role

    Pool Contractor Builder

    What Made This Project Special

    Collaborative Approach

    Worked closely with the general contractor to coordinate complex logistics including crane schedules and material deliveries on an active high-rise construction site.

    Excellent Communication

    Maintained constant communication with safety inspectors and project stakeholders to ensure all safety requirements were met throughout the elevated construction.

    Speed of Delivery

    Completed the project on schedule despite the unique logistical challenges of 8th-floor construction in downtown Denver.

    Lessons Learned

    High-rise pool construction requires exceptional coordination and patience. Safety protocols for edge-of-building work must be prioritized, and daily coordination of crane schedules and deliveries is essential for staying on track.

    Project Gallery

    Final Photos 1
    Final Photos
    Final Photos 2
    Final Photos
    Final Photos 3
    Final Photos
    Pre-Construction 1
    Pre-Construction
    Pre-Construction 2
    Pre-Construction
    Pre-Construction 3
    Pre-Construction
    Pre-Construction 4
    Pre-Construction
    Plumbing & Steel 1
    Plumbing & Steel
    Plumbing & Steel 2
    Plumbing & Steel
    Plumbing & Steel 3
    Plumbing & Steel
    Plumbing & Steel 4
    Plumbing & Steel
    Shotcrete 1
    Shotcrete
    Shotcrete 2
    Shotcrete
    Shotcrete 3
    Shotcrete
    Shotcrete 4
    Shotcrete
    Shotcrete 5
    Shotcrete
    Shotcrete 6
    Shotcrete
    Shotcrete 7
    Shotcrete
    Masonry 1
    Masonry
    Interior Finish 1
    Interior Finish